Construction site layout 3D, schedule (preliminary), formwork and slipform, Method Statement, 4D model.
To provide fabrication of the GBS, assembly and installation of topside modules, we are building the Offshore Superfacility Construction Center in Belokamenka near Murmansk. The Center will comprise two dry docks to build GBS, and facilities to manufacture topside modules.
GBS (Gravity Base Structure)
BIM-model modification, 3D Construction site layout, codes
4D model (with auto matching by codes)
Texture, render, video editing